Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute t...
Saved in:
Main Authors: | Mohammad Asri, Mohammad Azwanie Naim, Mohd Nawi, Mohd Nasrun, Saad, Rohaizah, Osman, Wan Nadzri, Anuar, Herman Shah |
---|---|
Format: | Article |
Language: | English |
Published: |
American Scientific Publishers
2016
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/19505/1/ASL%20%205%206%202016%201593-1596.pdf http://repo.uum.edu.my/19505/ http://doi.org/10.1166/asl.2016.6696 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Actualizing lean construction: Barriers toward the implementation
by: Mohammad Asri, Mohammad Azwanie Naim, et al.
Published: (2015) -
Actualizing lean construction: Barriers toward the implementation
by: Mohammad Asri, Mohammad Azwanie Naim, et al.
Published: (2015) -
Logistics best practices towards logistics performance in Malaysia moderated with lean logistics
by: Mohamad Makmor, Mohamad Fared, et al.
Published: (2023) -
Adoption of cloud based decision support system for building information modeling software selection
by: Nursal, Ahmad Taufik, et al.
Published: (2016) -
A proposal for improving sustainability practice through the implementations of reuse and recycle technique in Malaysian construction industry
by: Osman, Wan Nadzri, et al.
Published: (2016)