Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute t...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
American Scientific Publishers
2016
|
Subjects: | |
Online Access: | http://repo.uum.edu.my/19505/1/ASL%20%205%206%202016%201593-1596.pdf http://repo.uum.edu.my/19505/ http://doi.org/10.1166/asl.2016.6696 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|