Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review

Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute t...

Full description

Saved in:
Bibliographic Details
Main Authors: Mohammad Asri, Mohammad Azwanie Naim, Mohd Nawi, Mohd Nasrun, Saad, Rohaizah, Osman, Wan Nadzri, Anuar, Herman Shah
Format: Article
Language:English
Published: American Scientific Publishers 2016
Subjects:
Online Access:http://repo.uum.edu.my/19505/1/ASL%20%205%206%202016%201593-1596.pdf
http://repo.uum.edu.my/19505/
http://doi.org/10.1166/asl.2016.6696
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uum.repo.19505
record_format eprints
spelling my.uum.repo.195052016-11-15T02:36:18Z http://repo.uum.edu.my/19505/ Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review Mohammad Asri, Mohammad Azwanie Naim Mohd Nawi, Mohd Nasrun Saad, Rohaizah Osman, Wan Nadzri Anuar, Herman Shah TH Building construction Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute to the knowledge and addressing the logistical issues in IBS and integrating lean construction to tackle that particular issue. The literature review has been conducted through relevant database.It was found that there is a need for more holistic approaches to be adopted in JIT implementation in Industrialized Building System (IBS) project.IBS were well known for the cost saving benefit that can be derived from the implementation of the system, but logistical problem during the performance of the project can affected the profit of the project which later may consume the benefit of cost reduction made on site. Suggestion on how JIT can contribute for improving the construction logistic management process in order to enhance IBS uptake in Malaysian construction projects will be concluded. American Scientific Publishers 2016 Article PeerReviewed application/pdf en http://repo.uum.edu.my/19505/1/ASL%20%205%206%202016%201593-1596.pdf Mohammad Asri, Mohammad Azwanie Naim and Mohd Nawi, Mohd Nasrun and Saad, Rohaizah and Osman, Wan Nadzri and Anuar, Herman Shah (2016) Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review. Advanced Science Letters, 22 (5). pp. 1593-1596. ISSN 1936-6612 http://doi.org/10.1166/asl.2016.6696 doi:10.1166/asl.2016.6696
institution Universiti Utara Malaysia
building UUM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Utara Malaysia
content_source UUM Institutionali Repository
url_provider http://repo.uum.edu.my/
language English
topic TH Building construction
spellingShingle TH Building construction
Mohammad Asri, Mohammad Azwanie Naim
Mohd Nawi, Mohd Nasrun
Saad, Rohaizah
Osman, Wan Nadzri
Anuar, Herman Shah
Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
description Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute to the knowledge and addressing the logistical issues in IBS and integrating lean construction to tackle that particular issue. The literature review has been conducted through relevant database.It was found that there is a need for more holistic approaches to be adopted in JIT implementation in Industrialized Building System (IBS) project.IBS were well known for the cost saving benefit that can be derived from the implementation of the system, but logistical problem during the performance of the project can affected the profit of the project which later may consume the benefit of cost reduction made on site. Suggestion on how JIT can contribute for improving the construction logistic management process in order to enhance IBS uptake in Malaysian construction projects will be concluded.
format Article
author Mohammad Asri, Mohammad Azwanie Naim
Mohd Nawi, Mohd Nasrun
Saad, Rohaizah
Osman, Wan Nadzri
Anuar, Herman Shah
author_facet Mohammad Asri, Mohammad Azwanie Naim
Mohd Nawi, Mohd Nasrun
Saad, Rohaizah
Osman, Wan Nadzri
Anuar, Herman Shah
author_sort Mohammad Asri, Mohammad Azwanie Naim
title Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
title_short Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
title_full Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
title_fullStr Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
title_full_unstemmed Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review
title_sort exploring lean construction component for malaysian industrialized building system logistics management - a literature review
publisher American Scientific Publishers
publishDate 2016
url http://repo.uum.edu.my/19505/1/ASL%20%205%206%202016%201593-1596.pdf
http://repo.uum.edu.my/19505/
http://doi.org/10.1166/asl.2016.6696
_version_ 1644282718284939264
score 13.211869