Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
A successful project schedule is one of the primary keys to project success. In this study, Fuzzy logic method (Decision maker’s risk index ranking value) is used to estimate the delay period of a project. It is obvious that the conventional project scheduling software is using either deterministic...
Saved in:
Main Author: | Voon, Sze Nee |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2017
|
Subjects: | |
Online Access: | http://eprints.usm.my/52120/1/Flexible%20Scheduling%20For%20Construction%20Project%20Using%20Fuzzy%20Logic%20Method%20And%20Critical%20Path%20Method%20%28CPM%29_Voon%20Sze%20Nee_A9_2017.pdf http://eprints.usm.my/52120/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Planning And Scheduling Technique In Project Management: A Study on Critical Path Method (CPM) to Improve Project Completion Time
by: Lim, Celia Han Jia
Published: (2014) -
The Key Factors of Critical Path Method in Manufacturing Industry Project
by: Dg Mohd Al Hafidz Bin Ishak,
Published: (2021) -
Critical path method and fuzzy logic for a project scheduling in basic t-shirt manufacturing / Siti Noorqamarina Rosli, Nurul Yasniza Mohd Yassin and Siti Nabiha Ishak
by: Rosli, Siti Noorqamarina, et al.
Published: (2023) -
Fuzzy Methods in Quantitative Risk Analysis of Construction Project
by: Rohman, M.Arif, et al.
Published: (2008) -
Crashing a project in PERT/CPM network
by: Syed Meera, Zahir Hussain, et al.
Published: (2011)