Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)

A successful project schedule is one of the primary keys to project success. In this study, Fuzzy logic method (Decision maker’s risk index ranking value) is used to estimate the delay period of a project. It is obvious that the conventional project scheduling software is using either deterministic...

Full description

Saved in:
Bibliographic Details
Main Author: Voon, Sze Nee
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/52120/1/Flexible%20Scheduling%20For%20Construction%20Project%20Using%20Fuzzy%20Logic%20Method%20And%20Critical%20Path%20Method%20%28CPM%29_Voon%20Sze%20Nee_A9_2017.pdf
http://eprints.usm.my/52120/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.usm.eprints.52120
record_format eprints
spelling my.usm.eprints.52120 http://eprints.usm.my/52120/ Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM) Voon, Sze Nee T Technology TA Engineering (General). Civil engineering (General) A successful project schedule is one of the primary keys to project success. In this study, Fuzzy logic method (Decision maker’s risk index ranking value) is used to estimate the delay period of a project. It is obvious that the conventional project scheduling software is using either deterministic or probabilistic method to compute the schedule duration, delays and lags. In other words, these methods use only quantitative inputs but not qualitative aspects associated with individual activities. Project manager who lack in experience will have a significant impact on the accessed duration. The method used in this paper which determined the critical path by the lowest risk path. The risk index is computed for each individual activity. A realistic project is considered for FPERT has been prepared using Excel. This project has been periodically updated until the project completion. Universiti Sains Malaysia 2017-06-01 Monograph NonPeerReviewed application/pdf en http://eprints.usm.my/52120/1/Flexible%20Scheduling%20For%20Construction%20Project%20Using%20Fuzzy%20Logic%20Method%20And%20Critical%20Path%20Method%20%28CPM%29_Voon%20Sze%20Nee_A9_2017.pdf Voon, Sze Nee (2017) Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM). Project Report. Universiti Sains Malaysia, Pusat Pengajian Kejuruteraan Awam. (Submitted)
institution Universiti Sains Malaysia
building Hamzah Sendut Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Sains Malaysia
content_source USM Institutional Repository
url_provider http://eprints.usm.my/
language English
topic T Technology
TA Engineering (General). Civil engineering (General)
spellingShingle T Technology
TA Engineering (General). Civil engineering (General)
Voon, Sze Nee
Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
description A successful project schedule is one of the primary keys to project success. In this study, Fuzzy logic method (Decision maker’s risk index ranking value) is used to estimate the delay period of a project. It is obvious that the conventional project scheduling software is using either deterministic or probabilistic method to compute the schedule duration, delays and lags. In other words, these methods use only quantitative inputs but not qualitative aspects associated with individual activities. Project manager who lack in experience will have a significant impact on the accessed duration. The method used in this paper which determined the critical path by the lowest risk path. The risk index is computed for each individual activity. A realistic project is considered for FPERT has been prepared using Excel. This project has been periodically updated until the project completion.
format Monograph
author Voon, Sze Nee
author_facet Voon, Sze Nee
author_sort Voon, Sze Nee
title Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
title_short Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
title_full Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
title_fullStr Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
title_full_unstemmed Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
title_sort flexible scheduling for construction project using fuzzy logic method and critical path method (cpm)
publisher Universiti Sains Malaysia
publishDate 2017
url http://eprints.usm.my/52120/1/Flexible%20Scheduling%20For%20Construction%20Project%20Using%20Fuzzy%20Logic%20Method%20And%20Critical%20Path%20Method%20%28CPM%29_Voon%20Sze%20Nee_A9_2017.pdf
http://eprints.usm.my/52120/
_version_ 1729703918291648512
score 13.211869