Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)

A successful project schedule is one of the primary keys to project success. In this study, Fuzzy logic method (Decision maker’s risk index ranking value) is used to estimate the delay period of a project. It is obvious that the conventional project scheduling software is using either deterministic...

Full description

Saved in:
Bibliographic Details
Main Author: Voon, Sze Nee
Format: Monograph
Language:English
Published: Universiti Sains Malaysia 2017
Subjects:
Online Access:http://eprints.usm.my/52120/1/Flexible%20Scheduling%20For%20Construction%20Project%20Using%20Fuzzy%20Logic%20Method%20And%20Critical%20Path%20Method%20%28CPM%29_Voon%20Sze%20Nee_A9_2017.pdf
http://eprints.usm.my/52120/
Tags: Add Tag
No Tags, Be the first to tag this record!