Flexible Scheduling For Construction Project Using Fuzzy Logic Method And Critical Path Method (CPM)
A successful project schedule is one of the primary keys to project success. In this study, Fuzzy logic method (Decision maker’s risk index ranking value) is used to estimate the delay period of a project. It is obvious that the conventional project scheduling software is using either deterministic...
Saved in:
Main Author: | |
---|---|
Format: | Monograph |
Language: | English |
Published: |
Universiti Sains Malaysia
2017
|
Subjects: | |
Online Access: | http://eprints.usm.my/52120/1/Flexible%20Scheduling%20For%20Construction%20Project%20Using%20Fuzzy%20Logic%20Method%20And%20Critical%20Path%20Method%20%28CPM%29_Voon%20Sze%20Nee_A9_2017.pdf http://eprints.usm.my/52120/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|