Surface Settlement caused by Pipe Jacking Works crossing KL-Seremban Highway
The rapid growth of rehabilitation systems has resulted in an increasing demand for tunnelling technology that can operate in extreme conditions which involves deep excavations and interruptions of utility lines and traffic flow. The chosen project comprising the installation of DN2500 mm sewerage r...
Saved in:
Main Author: | Razali, Nur Diana Natasya |
---|---|
Format: | Final Year Project |
Language: | English |
Published: |
2022
|
Subjects: | |
Online Access: | http://utpedia.utp.edu.my/id/eprint/24152/1/Surface%20Settlement%20caused%20by%20Pipe%20Jacking%20Works%20crossing.pdf http://utpedia.utp.edu.my/id/eprint/24152/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Pipe jacking method in GRP pipe technology & installation
by: Ong, Boo Soon, Ir.
Published: (2018) -
Site investigation, sampling and slope stability analysis at kilometer 141 KL-Kuantan highway
by: Audi Munir, Mahmud
Published: (2011) -
Settlement Analysis due to Micro-Tunnelling Works
by: Che Hassan, Nur Muhammad Hadri
Published: (2017) -
Effect Of Pipe Roof Support On The Ground Settlement Induced By Shallow Tunnel Excavation
by: Abdul Latif, Mohd Fandey
Published: (2016) -
Effects of tunnel face distance on surface settlement
by: Marto, A., et al.
Published: (2016)