Case Study of sewerage pipe installation using Pipe Jacking and Micro-tunnelling Boring Machine (MTBM) in Ipoh
This paper provides a review of the sewerage pipe installations near Jalan Pengkalan Perindustrian, Ipoh Perak using pipe jacking and micro-tunneling methods. The alignment of the pipe installation involving tunneling and jacking beneath the KTMB (Kereta Api Tanah Melayu Berhad) railway track with 1...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
IOP Publishing Ltd
2020
|
Online Access: | https://www.scopus.com/inward/record.uri?eid=2-s2.0-85098510661&doi=10.1088%2f1757-899X%2f932%2f1%2f012047&partnerID=40&md5=ae29585eb52bc9fc72ae9819f7edf3dd http://eprints.utp.edu.my/23064/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|