Work breakdown structure application for man-hours calculation in hull construction shipbuilding in Malaysia
In Malaysia, the majority of oil & gas platform construction use fixed type substructure such as jacket type platform. To date, only one Semi-FPS has been constructed in Malaysia involving complex and challenging issues in the construction of hull substructure. Oil & gas project managers hav...
Saved in:
Main Authors: | Wan Abd Rahman, W. A. Z., Mohd. Zaki, N. I., Abu Husain, M. K. |
---|---|
格式: | Article |
语言: | English |
出版: |
Cogent OA
2019
|
主题: | |
在线阅读: | http://eprints.utm.my/id/eprint/88789/1/NoorIrzaZaki2019_WorkBreakdownStructureApplication.pdf http://eprints.utm.my/id/eprint/88789/ http://www.dx.doi.org/10.1080/23311916.2019.1599524 |
标签: |
添加标签
没有标签, 成为第一个标记此记录!
|
相似书籍
-
A review of work breakdown structure and man-hours estimation method used in shipbuilding production
由: Rahman, W. A. Z. W. A., et al.
出版: (2019) -
The Correlation Of Shipyard Practices And Shipyard Performance In Relation To Hull's Block Construction In A Typical Malaysian Shipbuilding.
由: Muhammad Ikhwan Bin Abdul Razak
出版: (2014) -
Evaluation on current practice in work breakdown structure approach for construction schedules
由: Md. Isha, Mohd. Nasir
出版: (2005) -
Evaluation on current practice in work breakdown structure approach for construction schedules
由: Md. Isha, Mohd. Nasir
出版: (2004) -
Productivity measurement in Malaysia shipbuilding industry
由: Roslee, Ahmad Azmeer
出版: (2009)