Process flow for work breakdown structure in plannning and scheduling : a comparative case study

Developing a work breakdown structure is an important step during the initial phase of the project that once the basic scope have been identified, initial work breakdown structure can be created with a limited scope of information. A work breakdown structure is the basis for planning and managing th...

Full description

Saved in:
Bibliographic Details
Main Author: Nurulzanna, Idris
Format: Undergraduates Project Papers
Language:English
Published: 2014
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/9319/1/NURULZANNA%20BINTI%20IDRIS.PDF
http://umpir.ump.edu.my/id/eprint/9319/
Tags: Add Tag
No Tags, Be the first to tag this record!