Construction contract clarity: conceptual process flow modeling
Construction contracts can be a complex subject if issues corresponding to their interpretation and administration are not handled properly. The need for clarity of construction contracts is eminent especially in the context of the construction industry. The paper holds that a better interpretation...
Saved in:
Main Authors: | Chong, Heap Yih, Lim, Chai Chai, Mohamad Zin, Rosli |
---|---|
Format: | Article |
Published: |
2012
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/46737/ http://dx.doi.org/10.4028/www.scientific.net/AMM.145.344 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Clarity of construction contract
by: Chong, Heap Yih
Published: (2007) -
Construction contract clarity: Conceptual process flow modeling
by: Mohamad Zin, Rosli
Published: (2007) -
Clarity and improving level of understanding of contract documentation
by: Mohamad, Mohamad Ibrahim, et al.
Published: (2008) -
Teacher Clarity or Pupil
Clarity or Both?
Conceptual Issues and Research Implications
by: Ling , Chu Poh
Published: (1993) -
Effects of Wall Temperature on the Viscoelastic Fluid Flow
through Gradual Contraction
by: Ahmad Suhaimi Bin Sokiman, Ahmad Suhaimi
Published: (2010)