Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet

Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing...

詳細記述

保存先:
書誌詳細
主要な著者: Jansen L., Sidek L.M., Julien P.Y.
その他の著者: 55812209200
フォーマット: Conference Paper
出版事項: Trans Tech Publications Ltd 2023
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
このレコードへの初めてのコメントを付けませんか!
この操作にはログインが必要です