Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing...
保存先:
主要な著者: | , , |
---|---|
その他の著者: | |
フォーマット: | Conference Paper |
出版事項: |
Trans Tech Publications Ltd
2023
|
タグ: |
タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
|
このレコードへの初めてのコメントを付けませんか!