Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing...
Saved in:
Main Authors: | Jansen L., Sidek L.M., Julien P.Y. |
---|---|
Other Authors: | 55812209200 |
Format: | Conference Paper |
Published: |
Trans Tech Publications Ltd
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
The monitoring of pesticides and alkylphenols in selected rivers in the state of Selan Jor, Malaysia
by: Tan, B.L.L., et al.
Published: (2004) -
Potential impacts of climate change on precipitation and temperature at Jor Dam Lake
by: Tayebiyan, Aida, et al.
Published: (2016) -
Potential impacts of climate change on precipitation and temperature at Jor Dam Lake
by: Tayebiyan A., et al.
Published: (2023) -
Batik centres for all Mun Loong outlets
by: Chin, P.Y.
Published: (1990) -
River Rehabilitation Criteria: Stream Rehabilitation Concepts, Guidelines and Examples
by: Julien, Pierre Y.
Published: (2005)