Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet

Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing...

Full description

Saved in:
Bibliographic Details
Main Authors: Jansen L., Sidek L.M., Julien P.Y.
Other Authors: 55812209200
Format: Conference Paper
Published: Trans Tech Publications Ltd 2023
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items