Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing...
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Conference Paper |
Published: |
Trans Tech Publications Ltd
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|