Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet

Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing...

Full description

Saved in:
Bibliographic Details
Main Authors: Jansen L., Sidek L.M., Julien P.Y.
Other Authors: 55812209200
Format: Conference Paper
Published: Trans Tech Publications Ltd 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-22097
record_format dspace
spelling my.uniten.dspace-220972023-05-16T10:47:21Z Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet Jansen L. Sidek L.M. Julien P.Y. 55812209200 35070506500 7102246042 Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing and inspection on the reservoir outlet revealed that the trash screen located at upstream of reservoir outlet had been damaged and dislodged creating a large opening at the trash screen thus permitting entry of larger logs which blocks the passage of water through the reservoir outlet. Bathymetric survey showed the total height of sediment deposition above the reservoir outlet covering the trash screen was estimated at approximately 13 m. The sediment volume estimated to be cleared from above the reservoir outlet area is 15,000 m3. Soil investigation conducted shows that the sediments deposited within the reservoir exhibits various different profile and characteristics. The average sediment distribution at deeper depths closer to the trash screen was found to be of 27% clay, 26% silt, 43% sand and 4% gravel. The rehabilitation works on structure as the low level outlet serves as an important feature for reservoir sedimentation management as well as for safe flood discharge release as designed for the dam. It is important that the function of the reservoir outlet structure is maintained in accordance to the International Dam Safety Standards. © (2014) Trans Tech Publications, Switzerland. Final 2023-05-16T02:47:21Z 2023-05-16T02:47:21Z 2014 Conference Paper 10.4028/www.scientific.net/AMM.567.128 2-s2.0-84903552276 https://www.scopus.com/inward/record.uri?eid=2-s2.0-84903552276&doi=10.4028%2fwww.scientific.net%2fAMM.567.128&partnerID=40&md5=a766712d1e5c8da1b362e461b4642d1c https://irepository.uniten.edu.my/handle/123456789/22097 567 128 132 Trans Tech Publications Ltd Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Jor reservoir was constructed to assure flow regulation for the Woh hydroelectric power station, as well as to provide storage for flood control. The reservoir outlet is frequently operated once every three months to flush the deposited sediments accumulated within the reservoir. Preliminary testing and inspection on the reservoir outlet revealed that the trash screen located at upstream of reservoir outlet had been damaged and dislodged creating a large opening at the trash screen thus permitting entry of larger logs which blocks the passage of water through the reservoir outlet. Bathymetric survey showed the total height of sediment deposition above the reservoir outlet covering the trash screen was estimated at approximately 13 m. The sediment volume estimated to be cleared from above the reservoir outlet area is 15,000 m3. Soil investigation conducted shows that the sediments deposited within the reservoir exhibits various different profile and characteristics. The average sediment distribution at deeper depths closer to the trash screen was found to be of 27% clay, 26% silt, 43% sand and 4% gravel. The rehabilitation works on structure as the low level outlet serves as an important feature for reservoir sedimentation management as well as for safe flood discharge release as designed for the dam. It is important that the function of the reservoir outlet structure is maintained in accordance to the International Dam Safety Standards. © (2014) Trans Tech Publications, Switzerland.
author2 55812209200
author_facet 55812209200
Jansen L.
Sidek L.M.
Julien P.Y.
format Conference Paper
author Jansen L.
Sidek L.M.
Julien P.Y.
spellingShingle Jansen L.
Sidek L.M.
Julien P.Y.
Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
author_sort Jansen L.
title Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
title_short Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
title_full Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
title_fullStr Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
title_full_unstemmed Preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
title_sort preliminary investigation and design considerations for the rehabilitation of trash screen at jor reservoir low level outlet
publisher Trans Tech Publications Ltd
publishDate 2023
_version_ 1806426441626157056
score 13.214268