Exploring lean construction component for Malaysian industrialized building system logistics management - A literature review

Inefficient logistic management can expose the project to the construction waste and eventually can effects the project performance.Just in time (JIT) is excellent in managing the construction logistic and achieving the project’s goal by eliminating waste.The purpose of this paper is to contribute t...

全面介绍

Saved in:
书目详细资料
Main Authors: Mohammad Asri, Mohammad Azwanie Naim, Mohd Nawi, Mohd Nasrun, Saad, Rohaizah, Osman, Wan Nadzri, Anuar, Herman Shah
格式: Article
语言:English
出版: American Scientific Publishers 2016
主题:
在线阅读:http://repo.uum.edu.my/19505/1/ASL%20%205%206%202016%201593-1596.pdf
http://repo.uum.edu.my/19505/
http://doi.org/10.1166/asl.2016.6696
标签: 添加标签
没有标签, 成为第一个标记此记录!