Management Of Multiple Projects In Pre-Design And Pre-Construction Phase

Construction Project Management is continuously getting the attention of the experts and day by day the field is getting new dimensions, views and perspectives. This knowledge has increased the competition among construction companies to procure many projects which have to be managed simultaneously...

Full description

Saved in:
Bibliographic Details
Main Authors: C.T, Ramanathan, Sambu Potty, Narayanan
Format: Conference or Workshop Item
Published: 2009
Subjects:
Online Access:http://eprints.utp.edu.my/2055/1/ciriac2009_%28Rama%29_final_paper.pdf
http://eprints.utp.edu.my/2055/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utp.eprints.2055
record_format eprints
spelling my.utp.eprints.20552017-01-19T08:25:11Z Management Of Multiple Projects In Pre-Design And Pre-Construction Phase C.T, Ramanathan Sambu Potty, Narayanan TA Engineering (General). Civil engineering (General) Construction Project Management is continuously getting the attention of the experts and day by day the field is getting new dimensions, views and perspectives. This knowledge has increased the competition among construction companies to procure many projects which have to be managed simultaneously. The lack of knowledge of design professionals to consider the constructability aspect of the design can result in scheduling problems, delays and complicated disputes during the construction phase. The management in pre design and pre construction phase will decide the projects’ fate even before the commencement of construction phase. This study examines the procedures adopted for effective management of multiple projects performed in Design and Build (D&B) platform. The flow chart of different stages of the D&B procedure is presented with output of each stage. The important aspects in the Management of Pre design and pre construction phase are analyzed in the following sequence: a) D&B process and procedures – a practical approach, b) Organizing required components at early design stage and c) Element optimization techniques. The case study of Multiple Bridge projects in Sabah, East Malaysia is presented. Methods of determining Specialist works are also analyzed based on various critical factors influencing the implementation process. 2009-11-03 Conference or Workshop Item PeerReviewed application/pdf http://eprints.utp.edu.my/2055/1/ciriac2009_%28Rama%29_final_paper.pdf C.T, Ramanathan and Sambu Potty, Narayanan (2009) Management Of Multiple Projects In Pre-Design And Pre-Construction Phase. In: 2nd Construction Industry Research Achievement International Conference 2009 (CIRIAC 2009), 3rd November - 5 November 2009, CIDB Convention Centre, Jalan Cheras, Kuala Lumpur. http://eprints.utp.edu.my/2055/
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Institutional Repository
url_provider http://eprints.utp.edu.my/
topic TA Engineering (General). Civil engineering (General)
spellingShingle TA Engineering (General). Civil engineering (General)
C.T, Ramanathan
Sambu Potty, Narayanan
Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
description Construction Project Management is continuously getting the attention of the experts and day by day the field is getting new dimensions, views and perspectives. This knowledge has increased the competition among construction companies to procure many projects which have to be managed simultaneously. The lack of knowledge of design professionals to consider the constructability aspect of the design can result in scheduling problems, delays and complicated disputes during the construction phase. The management in pre design and pre construction phase will decide the projects’ fate even before the commencement of construction phase. This study examines the procedures adopted for effective management of multiple projects performed in Design and Build (D&B) platform. The flow chart of different stages of the D&B procedure is presented with output of each stage. The important aspects in the Management of Pre design and pre construction phase are analyzed in the following sequence: a) D&B process and procedures – a practical approach, b) Organizing required components at early design stage and c) Element optimization techniques. The case study of Multiple Bridge projects in Sabah, East Malaysia is presented. Methods of determining Specialist works are also analyzed based on various critical factors influencing the implementation process.
format Conference or Workshop Item
author C.T, Ramanathan
Sambu Potty, Narayanan
author_facet C.T, Ramanathan
Sambu Potty, Narayanan
author_sort C.T, Ramanathan
title Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_short Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_full Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_fullStr Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_full_unstemmed Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_sort management of multiple projects in pre-design and pre-construction phase
publishDate 2009
url http://eprints.utp.edu.my/2055/1/ciriac2009_%28Rama%29_final_paper.pdf
http://eprints.utp.edu.my/2055/
_version_ 1738655168100040704
score 13.209306