Element optimisation techniques in multiple DB bridge projects
Management of multiple bridge projects relies on the selection and optimisation of elements. Problems are avoided if construction knowledge and experience are utilised. A systematic selection process is required during design stage to maximise the use of available resources. Multiple bridge designs...
Saved in:
Main Authors: | , |
---|---|
Format: | Non-Citation Index Journal |
Published: |
2008
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/11051/1/platform_6_2_july_dec2008.pdf http://eprints.utp.edu.my/11051/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|