Mating Load Analysis of Topside Float-over Installation

topside from a barge to a fixed or floating substructure without the service of the lift crane vessel and dependent mainly on the barge ballasting operation. Various analysis which basically consisted of numerical simulation and model tests are conducted as assurance of the success of float-over...

Full description

Saved in:
Bibliographic Details
Main Authors: Kurian, V.J., Yunos, N.Z.M., Magee, A.R., Razak, Z.A.
Format: Conference or Workshop Item
Published: 2013
Subjects:
Online Access:http://eprints.utp.edu.my/10117/1/1569690391.pdf
http://eprints.utp.edu.my/10117/
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first