Mating Load Analysis of Topside Float-over Installation
topside from a barge to a fixed or floating substructure without the service of the lift crane vessel and dependent mainly on the barge ballasting operation. Various analysis which basically consisted of numerical simulation and model tests are conducted as assurance of the success of float-over...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/10117/1/1569690391.pdf http://eprints.utp.edu.my/10117/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|