Model Testing Capabilities for Verification of Floatover Operations
Investigations into the barge motions, mating load interfaces between the topside leg and jacket leg and mooring lines tensions for floatover installations are presented. Floatover installation means an operation of transferring the topside onto its fixed or floating substructure dependent mainl...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://eprints.utp.edu.my/11323/1/14TPC-0270Magee.pdf http://www.isope2014.org/ http://eprints.utp.edu.my/11323/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|