Development of an effective inspection plan for pressure vessels according risk-based inspection technology for polyethylene plant
In order to ensure the asset integrity, all unfired pressure vessels (UPVs) should be examined at the intervals recommended in inspection codes or risk-based inspection (RBI) assessment. RBI assessment may allow previous inspection intervals to be extended and the inspection method may be reselected...
Saved in:
Main Author: | Saw, Ping Lih |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/81429/1/SawPingLihMFKM2016.pdf http://eprints.utm.my/id/eprint/81429/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:120279 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Risk Based Inspection on Gas Processing Plant
by: Mohd Yunus, Mohd Zulfadli
Published: (2008) -
Risk Based Inspection Study on Relief Valves at Offshore and Onshore Plant
by: Mat Saad, Muhammad Najib Bin
Published: (2009) -
Implementation of Risk-Based Inspection on Offshore Facilities
by: MUHAMMAD AQMAL BIN RATASHA, MUHAMMAD AQMAL
Published: (2008) -
Development of Knowledge Based Welding Inspection Data and Generate Report Format
According to Standard Code
by: Vong, Winnie Chin Joo
Published: (2005) -
Risk-Based Inspection – Flyash Erosion on Boiler Tube at Coal-Fired Power Plant
by: Mohamad Hasrul Hilmi b. Khairul Aman, Mohamad Hasrul Hilmi
Published: (2010)