The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia
It has been said that Indonesian constructions often suffer serious cost and time overrun. Kaming et.al., (1997a) and Trigunarsyah (2004) have studied the causes of these problems. However, their studies focused only on the high rise buildings in Jakarta and Yogyakarta. Since Indonesia is a large co...
Saved in:
Main Author: | Harisaweni, Harisaweni |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2007
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/6102/1/HarisaweniMFAB2007.pdf http://eprints.utm.my/id/eprint/6102/ http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:62067 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Minimizing cost-overruns in construction projects
by: Daud, Siti Aminah, et al.
Published: (2015) -
An exploration of cost overrun in building construction projects
by: Tan, Chin Keng, et al.
Published: (2018) -
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
by: Norul Izzati, M. Ashaari, et al.
Published: (2019) -
Case on Integrated Time and Cost Monitoring of Construction Projects
by: M., Waris, et al.
Published: (2017) -
Minimizing the maintenance costs of shuttle bus services using iterative heuristic
by: Mat Desa, Wan Laailatul Hanim, et al.
Published: (2018)