The framework for minimizing construction time and cost overruns in Padang and Pekanbaru, Indonesia

It has been said that Indonesian constructions often suffer serious cost and time overrun. Kaming et.al., (1997a) and Trigunarsyah (2004) have studied the causes of these problems. However, their studies focused only on the high rise buildings in Jakarta and Yogyakarta. Since Indonesia is a large co...

Full description

Saved in:
Bibliographic Details
Main Author: Harisaweni, Harisaweni
Format: Thesis
Language:English
Published: 2007
Subjects:
Online Access:http://eprints.utm.my/id/eprint/6102/1/HarisaweniMFAB2007.pdf
http://eprints.utm.my/id/eprint/6102/
http://dms.library.utm.my:8080/vital/access/manager/Repository/vital:62067
Tags: Add Tag
No Tags, Be the first to tag this record!