Scheduling on transportation for industrialized building systems
Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...
Saved in:
Main Author: | Foong, Kok Li |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf http://eprints.utm.my/id/eprint/4582/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Industrialised building system formation scheduling for public buildings
by: Tay, Allan Eng Mian
Published: (2006) -
Perception of Industrialized Building System (IBS) Within the Malaysian Market
by: Idrus, Arazi, et al.
Published: (2008) -
Sales expense strategies for competitive pricing of industrial building system (IBS) components
by: Aziz, N. D., et al.
Published: (2021) -
Building information modeling in local construction industry
by: Dabo Baba, Hammad
Published: (2010) -
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018)