Scheduling on transportation for industrialized building systems
Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...
Saved in:
Main Author: | |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2006
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf http://eprints.utm.my/id/eprint/4582/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
id |
my.utm.4582 |
---|---|
record_format |
eprints |
spelling |
my.utm.45822018-02-26T06:12:01Z http://eprints.utm.my/id/eprint/4582/ Scheduling on transportation for industrialized building systems Foong, Kok Li TH Building construction TA Engineering (General). Civil engineering (General) Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illustrate the management of IBS transportation for fabricators. Besides, the number of trucks required each day will be discussed here based on proper scheduling using project management software. Other than that, this study focuses on the scheduling by optimization. This project highlights a proper management of the trucks used in the delivery of IBS components for construction. 2006-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf Foong, Kok Li (2006) Scheduling on transportation for industrialized building systems. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering. |
institution |
Universiti Teknologi Malaysia |
building |
UTM Library |
collection |
Institutional Repository |
continent |
Asia |
country |
Malaysia |
content_provider |
Universiti Teknologi Malaysia |
content_source |
UTM Institutional Repository |
url_provider |
http://eprints.utm.my/ |
language |
English |
topic |
TH Building construction TA Engineering (General). Civil engineering (General) |
spellingShingle |
TH Building construction TA Engineering (General). Civil engineering (General) Foong, Kok Li Scheduling on transportation for industrialized building systems |
description |
Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illustrate the management of IBS transportation for fabricators. Besides, the number of trucks required each day will be discussed here based on proper scheduling using project management software. Other than that, this study focuses on the scheduling by optimization. This project highlights a proper management of the trucks used in the delivery of IBS components for construction. |
format |
Thesis |
author |
Foong, Kok Li |
author_facet |
Foong, Kok Li |
author_sort |
Foong, Kok Li |
title |
Scheduling on transportation for industrialized building systems |
title_short |
Scheduling on transportation for industrialized building systems |
title_full |
Scheduling on transportation for industrialized building systems |
title_fullStr |
Scheduling on transportation for industrialized building systems |
title_full_unstemmed |
Scheduling on transportation for industrialized building systems |
title_sort |
scheduling on transportation for industrialized building systems |
publishDate |
2006 |
url |
http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf http://eprints.utm.my/id/eprint/4582/ |
_version_ |
1643644096120619008 |
score |
13.159267 |