Scheduling on transportation for industrialized building systems

Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...

Full description

Saved in:
Bibliographic Details
Main Author: Foong, Kok Li
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf
http://eprints.utm.my/id/eprint/4582/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.utm.4582
record_format eprints
spelling my.utm.45822018-02-26T06:12:01Z http://eprints.utm.my/id/eprint/4582/ Scheduling on transportation for industrialized building systems Foong, Kok Li TH Building construction TA Engineering (General). Civil engineering (General) Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illustrate the management of IBS transportation for fabricators. Besides, the number of trucks required each day will be discussed here based on proper scheduling using project management software. Other than that, this study focuses on the scheduling by optimization. This project highlights a proper management of the trucks used in the delivery of IBS components for construction. 2006-04 Thesis NonPeerReviewed application/pdf en http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf Foong, Kok Li (2006) Scheduling on transportation for industrialized building systems. Masters thesis, Universiti Teknologi Malaysia, Faculty of Civil Engineering.
institution Universiti Teknologi Malaysia
building UTM Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Malaysia
content_source UTM Institutional Repository
url_provider http://eprints.utm.my/
language English
topic TH Building construction
TA Engineering (General). Civil engineering (General)
spellingShingle TH Building construction
TA Engineering (General). Civil engineering (General)
Foong, Kok Li
Scheduling on transportation for industrialized building systems
description Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illustrate the management of IBS transportation for fabricators. Besides, the number of trucks required each day will be discussed here based on proper scheduling using project management software. Other than that, this study focuses on the scheduling by optimization. This project highlights a proper management of the trucks used in the delivery of IBS components for construction.
format Thesis
author Foong, Kok Li
author_facet Foong, Kok Li
author_sort Foong, Kok Li
title Scheduling on transportation for industrialized building systems
title_short Scheduling on transportation for industrialized building systems
title_full Scheduling on transportation for industrialized building systems
title_fullStr Scheduling on transportation for industrialized building systems
title_full_unstemmed Scheduling on transportation for industrialized building systems
title_sort scheduling on transportation for industrialized building systems
publishDate 2006
url http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf
http://eprints.utm.my/id/eprint/4582/
_version_ 1643644096120619008
score 13.159267