Scheduling on transportation for industrialized building systems

Now, the construction is facing the challenges from the four main aspects, which are quality, cost, time and safety. However, by implementing the industrialized building system (IBS), all those challenges can be faced easily. In this study, double storey shop houses will be used as a model to illust...

Full description

Saved in:
Bibliographic Details
Main Author: Foong, Kok Li
Format: Thesis
Language:English
Published: 2006
Subjects:
Online Access:http://eprints.utm.my/id/eprint/4582/1/FoongKokLiMFKA2006.pdf
http://eprints.utm.my/id/eprint/4582/
Tags: Add Tag
No Tags, Be the first to tag this record!