A case history of ground improvement work for Kuala Lumpur International Airport 2
Prefabricated Vertical Drain incorporated with preloading has been used widely as a ground improvement technique in Geotechnical Engineering. The application of Prefabricated Vertical Drain and Preloading has proven to be one of the cheapest methods in ground improvement technique. In this paper,...
Saved in:
Main Authors: | Nazir, Ramli, Syam, Affiz, Razak, A., Mansor, M. |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/37110/1/A4.pdf http://eprints.utm.my/id/eprint/37110/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Arrival time flight scheduling in Kuala Lumpur international airport
by: Ab. Wahid, Mastura, et al.
Published: (2018) -
Preloading and prefabricated vertical drain technique for soft ground improvement in soft clay
by: A. Razak, Affiz Syam
Published: (2012) -
Kuala Lumpur International Airport :bird strike study.
by: Universiti Malaysia Sarawak, Centre for Technology Transfer and Consultancy (CTTC)
Published: (2016) -
Improved safety surface access at low cost airports: Kuala Lumpur International Airport, Malaysia case study
by: Sabar, Rohafiz, et al.
Published: (2014) -
Aircraft ground movement delay: a descriptive statistical analysis at Kuala Lumpur International Airport
by: Izuddin Md. Ithnan, M., et al.
Published: (2016)