Ground improvement using SPVD and RPE
Excessive total and differential settlement at the intersection of a surcharged prefabricated vertical drain (SPVD) and a rigid piled embankment on soft ground during the post-construction period leads to considerable time and costs being spent on repetitive remedial works in the future. This paper...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Article |
Published: |
Springer Verlag
2017
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/75366/ https://www.scopus.com/inward/record.uri?eid=2-s2.0-85036519637&doi=10.1007%2fs12517-017-3284-6&partnerID=40&md5=dd16605ff0fea408814e22de619b0c68 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|