Ground improvement using SPVD and RPE

Excessive total and differential settlement at the intersection of a surcharged prefabricated vertical drain (SPVD) and a rigid piled embankment on soft ground during the post-construction period leads to considerable time and costs being spent on repetitive remedial works in the future. This paper...

Full description

Saved in:
Bibliographic Details
Main Authors: Nazir, R., Moayedi, H., Subramaniam, P., Ghareh, S.
Format: Article
Published: Springer Verlag 2017
Subjects:
Online Access:http://eprints.utm.my/id/eprint/75366/
https://www.scopus.com/inward/record.uri?eid=2-s2.0-85036519637&doi=10.1007%2fs12517-017-3284-6&partnerID=40&md5=dd16605ff0fea408814e22de619b0c68
Tags: Add Tag
No Tags, Be the first to tag this record!