Work improvement at an animal feed mill
This Project was carried out at Nurinfra Mutiara FeedMill Sdn. Bhd. at Kuala Terengganu. The objectives are to identify which workstations with high cycle time and bottleneck, to propose the solution to increase the output capacity and to propose new design of manual handling. The major problem has...
Saved in:
Main Author: | Muhammed Salleh, Noor Masnira |
---|---|
Format: | Thesis |
Published: |
2011
|
Subjects: | |
Online Access: | http://eprints.utm.my/id/eprint/24986/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analyzing the Effect of Feed-in Tariff and Reserve Margin on Renewable Generation Capacity Expansion
by: Akhwanzada, Salman A., et al.
Published: (2013) -
Work-family conflict and work-family enrichment and their consequences in Malaysia
by: A. Hamid, Rozanti, et al.
Published: (2014) -
Person-organisation fit and turnover intention: the mediating role of work engagement
by: Memon, Mumtaz Ali, et al.
Published: (2018) -
Quality of work life and lifelong learning among working adults in Malaysia: The mediating role of employee engagement
by: Ho, Bradley C.Y., et al.
Published: (2021) -
Workers' participation in safety and health at work
by: Khairiah, Soehod
Published: (2008)