Changeover monitoring tool as the measure of time loss in automotive production
Manufacture; Automotive manufacturing; Automotive production; Case-studies; Change-over time; Changeover; Leadtime; Manufacturing companies; Monitoring tools; Non-valued added; Time loss; Productivity
Saved in:
Main Authors: | Abdul Rasib A.H., Ebrahim Z., Abdullah R., Mohd Amin A.N., Mohamad Rafaai Z.F. |
---|---|
Other Authors: | 57195394283 |
Format: | Conference Paper |
Published: |
Springer Science and Business Media Deutschland GmbH
2023
|
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Framework for Measuring The Effect of Changeover Time To
Overall Equipment Effectiveness
by: Muhamad Arifpin, Mansor, et al.
Published: (2015) -
Deployment Of Gross Profit Loss For Attenuating Time Loss Impact In Automotive Industries
by: Abdul Rasib, Amir Hamzah, et al.
Published: (2019) -
Changeover time reduction for die cut machine
by: Yusraa, yusoff
Published: (2016) -
Unnecessary overtime as a component of time loss measures in assembly processes
by: Ebrahim, Zuhriah, et al.
Published: (2017) -
The validation of productivity on the changeover activity at the automotive stamping press line by comparing the embedded SMED frame-work versus SMED approach: A witness simulation case study
by: Basri, A.Q., et al.
Published: (2019)