Changeover monitoring tool as the measure of time loss in automotive production

Manufacture; Automotive manufacturing; Automotive production; Case-studies; Change-over time; Changeover; Leadtime; Manufacturing companies; Monitoring tools; Non-valued added; Time loss; Productivity

Saved in:
Bibliographic Details
Main Authors: Abdul Rasib A.H., Ebrahim Z., Abdullah R., Mohd Amin A.N., Mohamad Rafaai Z.F.
Other Authors: 57195394283
Format: Conference Paper
Published: Springer Science and Business Media Deutschland GmbH 2023
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uniten.dspace-26614
record_format dspace
spelling my.uniten.dspace-266142023-05-29T17:12:48Z Changeover monitoring tool as the measure of time loss in automotive production Abdul Rasib A.H. Ebrahim Z. Abdullah R. Mohd Amin A.N. Mohamad Rafaai Z.F. 57195394283 55339198400 56650070800 57205662825 57218873528 Manufacture; Automotive manufacturing; Automotive production; Case-studies; Change-over time; Changeover; Leadtime; Manufacturing companies; Monitoring tools; Non-valued added; Time loss; Productivity Time Loss is a critical issues in automotive production through non-valued added activities and effected to the overall productivity. This paper introduces the changeover monitoring tool as a function for monitoring time loss during changeover activities in automotive production. The tool for monitoring changeover can be specified known as Non-valued Changeover Time (NVCOT). The structure of NVCOT is developed through the analysis of literature study on assembly processes. The subsequent step is to do a verification of NVCOT�s structure in manufacturing industries. The verification is verified by the industry�s practitioners through the step of interview sessions. Finally, the structure of NVCOT is validated through case studies of five automotive manufacturing companies. In this study, the results of time loss based on non-valued added activities in automotive production is commonly affected by four basic factors; (i) Front and Rear, (ii) Right and Left, (iii) Model Variety, and (iv) Product Variety. In conclusion, overall steps of studies are based on changeover activities in automotive manufacturing. The case study of five manufacturing firms of manufacturing companies has helped to prove the robustness of NVCOT. Thus, the NVCOT can be used as changeover monitoring tool for catering changeover time reduction improvement. � Springer Nature Singapore Pte Ltd. 2021. Final 2023-05-29T09:12:48Z 2023-05-29T09:12:48Z 2021 Conference Paper 10.1007/978-981-15-7309-5_11 2-s2.0-85090527453 https://www.scopus.com/inward/record.uri?eid=2-s2.0-85090527453&doi=10.1007%2f978-981-15-7309-5_11&partnerID=40&md5=9121625374382e7f21c8221c1fdd8c1c https://irepository.uniten.edu.my/handle/123456789/26614 109 120 Springer Science and Business Media Deutschland GmbH Scopus
institution Universiti Tenaga Nasional
building UNITEN Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Tenaga Nasional
content_source UNITEN Institutional Repository
url_provider http://dspace.uniten.edu.my/
description Manufacture; Automotive manufacturing; Automotive production; Case-studies; Change-over time; Changeover; Leadtime; Manufacturing companies; Monitoring tools; Non-valued added; Time loss; Productivity
author2 57195394283
author_facet 57195394283
Abdul Rasib A.H.
Ebrahim Z.
Abdullah R.
Mohd Amin A.N.
Mohamad Rafaai Z.F.
format Conference Paper
author Abdul Rasib A.H.
Ebrahim Z.
Abdullah R.
Mohd Amin A.N.
Mohamad Rafaai Z.F.
spellingShingle Abdul Rasib A.H.
Ebrahim Z.
Abdullah R.
Mohd Amin A.N.
Mohamad Rafaai Z.F.
Changeover monitoring tool as the measure of time loss in automotive production
author_sort Abdul Rasib A.H.
title Changeover monitoring tool as the measure of time loss in automotive production
title_short Changeover monitoring tool as the measure of time loss in automotive production
title_full Changeover monitoring tool as the measure of time loss in automotive production
title_fullStr Changeover monitoring tool as the measure of time loss in automotive production
title_full_unstemmed Changeover monitoring tool as the measure of time loss in automotive production
title_sort changeover monitoring tool as the measure of time loss in automotive production
publisher Springer Science and Business Media Deutschland GmbH
publishDate 2023
_version_ 1806424041624436736
score 13.211869