Environmental considerations for the 3 x 700MW coal-fired Manjung Project
Link to publisher’s homepage at http://www.myiem.org.my/
Saved in:
Main Authors: | Amir, Mahmud, Baker, E. William |
---|---|
Format: | Article |
Language: | English |
Published: |
The Institution of Engineers, Malaysia
2011
|
Subjects: | |
Online Access: | http://dspace.unimap.edu.my/xmlui/handle/123456789/15884 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Manjung Power Station - The new experience
by: Mohd Faiz, Salim
Published: (2011) -
Talk on 'Construction and operational experience of a Malaysian power project: The 3x700MW Coal-Fired Manjung Deal'
by: Fathullah Razak, Ghazalli
Published: (2011) -
Aplikasi myTNB mudahkan pengguna
by: T N Alagesh, et al.
Published: (2018) -
Keputusan kewangan TNB
by: Anon
Published: (2016) -
Debt management: FY2000 - 2QFY2012
by: Malaysia, Tenaga Nasional Berhad
Published: (2012)