Environmental considerations for the 3 x 700MW coal-fired Manjung Project

Link to publisher’s homepage at http://www.myiem.org.my/

Saved in:
Bibliographic Details
Main Authors: Amir, Mahmud, Baker, E. William
Format: Article
Language:English
Published: The Institution of Engineers, Malaysia 2011
Subjects:
Online Access:http://dspace.unimap.edu.my/xmlui/handle/123456789/15884
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.unimap-15884
record_format dspace
spelling my.unimap-158842011-11-17T04:03:45Z Environmental considerations for the 3 x 700MW coal-fired Manjung Project Amir, Mahmud Baker, E. William Coal-fired power plant TNB Janamanjung (TNBJ) Tenaga Nasional Berhad (TNB) Electricity Fuel Power station Link to publisher’s homepage at http://www.myiem.org.my/ 2011-11-17T04:03:45Z 2011-11-17T04:03:45Z 2004-11 Article p.6-8, 10 0126-9909 http://www.myiem.org.my/content/iem_bulletin_2004_2007-163.aspx http://hdl.handle.net/123456789/15884 en Jurutera 2004 (11) The Institution of Engineers, Malaysia
institution Universiti Malaysia Perlis
building UniMAP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Perlis
content_source UniMAP Library Digital Repository
url_provider http://dspace.unimap.edu.my/
language English
topic Coal-fired power plant
TNB Janamanjung (TNBJ)
Tenaga Nasional Berhad (TNB)
Electricity
Fuel
Power station
spellingShingle Coal-fired power plant
TNB Janamanjung (TNBJ)
Tenaga Nasional Berhad (TNB)
Electricity
Fuel
Power station
Amir, Mahmud
Baker, E. William
Environmental considerations for the 3 x 700MW coal-fired Manjung Project
description Link to publisher’s homepage at http://www.myiem.org.my/
format Article
author Amir, Mahmud
Baker, E. William
author_facet Amir, Mahmud
Baker, E. William
author_sort Amir, Mahmud
title Environmental considerations for the 3 x 700MW coal-fired Manjung Project
title_short Environmental considerations for the 3 x 700MW coal-fired Manjung Project
title_full Environmental considerations for the 3 x 700MW coal-fired Manjung Project
title_fullStr Environmental considerations for the 3 x 700MW coal-fired Manjung Project
title_full_unstemmed Environmental considerations for the 3 x 700MW coal-fired Manjung Project
title_sort environmental considerations for the 3 x 700mw coal-fired manjung project
publisher The Institution of Engineers, Malaysia
publishDate 2011
url http://dspace.unimap.edu.my/xmlui/handle/123456789/15884
_version_ 1643791091781074944
score 13.222552