Development of optimized maintenance scheduling model for coal-fired power plant boiler

Maintenance in power plants is crucial to extend the life and reducing the risk of sudden breakdown or outage of coal-fired power plant steam boilers. Traditionally, coal fired power plant boilers are scheduled for maintenance in periods to ensure that the demand of the system is fully met and the r...

詳細記述

保存先:
書誌詳細
第一著者: Noor Fazreen Binti Ahmad Fuzi, Ms.
フォーマット: text::Thesis
言語:English
出版事項: 2023
主題:
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!