The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
This paper presents a real-world, capacitated examination timetabling problem from Universiti Malaysia Pahang (UMP), Malaysia. The problem has constraints which have not been modelled before, these being the distance between examination rooms and splitting exams across several rooms. These constrain...
محفوظ في:
المؤلفون الرئيسيون: | M. N. M., Kahar, G., Kendall |
---|---|
التنسيق: | مقال |
اللغة: | English English |
منشور في: |
Science Direct
2021
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://umpir.ump.edu.my/id/eprint/33571/1/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang_%20FULL.pdf http://umpir.ump.edu.my/id/eprint/33571/2/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang.pdf http://umpir.ump.edu.my/id/eprint/33571/ https://doi.org/10.1016/j.ejor.2010.04.011 https://doi.org/10.1016/j.ejor.2010.04.011 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
مواد مشابهة
-
Universiti Malaysia Pahang examination timetabling problem: scheduling invigilators
بواسطة: M. N. M., Kahar, وآخرون
منشور في: (2014) -
Performance analyses of graph heuristics and selected trajectory metaheuristics on examination timetable problem
بواسطة: Mandal, Ashis Kumar, وآخرون
منشور في: (2020) -
Modelling the Universiti Malaysia Pahang examination timetabling problem
بواسطة: Ling, Shing Chang, وآخرون
منشور في: (2018) -
Combination of Graph Heuristic with Hill Climbing Search for Solving Capacitated Examination Timetabling Problem
بواسطة: Ashis Kumar, Mandal, وآخرون
منشور في: (2015) -
Addressing examination timetabling problem using a partial exams approach in constructive and improvement
بواسطة: Mandal, Ashis Kumar, وآخرون
منشور في: (2020)