The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution
This paper presents a real-world, capacitated examination timetabling problem from Universiti Malaysia Pahang (UMP), Malaysia. The problem has constraints which have not been modelled before, these being the distance between examination rooms and splitting exams across several rooms. These constrain...
Saved in:
Main Authors: | M. N. M., Kahar, G., Kendall |
---|---|
Format: | Article |
Language: | English English |
Published: |
Science Direct
2021
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/33571/1/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang_%20FULL.pdf http://umpir.ump.edu.my/id/eprint/33571/2/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang.pdf http://umpir.ump.edu.my/id/eprint/33571/ https://doi.org/10.1016/j.ejor.2010.04.011 https://doi.org/10.1016/j.ejor.2010.04.011 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Universiti Malaysia Pahang examination timetabling problem: scheduling invigilators
by: M. N. M., Kahar, et al.
Published: (2014) -
Performance analyses of graph heuristics and selected trajectory metaheuristics on examination timetable problem
by: Mandal, Ashis Kumar, et al.
Published: (2020) -
Modelling the Universiti Malaysia Pahang examination timetabling problem
by: Ling, Shing Chang, et al.
Published: (2018) -
Combination of Graph Heuristic with Hill Climbing Search for Solving Capacitated Examination Timetabling Problem
by: Ashis Kumar, Mandal, et al.
Published: (2015) -
Addressing examination timetabling problem using a partial exams approach in constructive and improvement
by: Mandal, Ashis Kumar, et al.
Published: (2020)