The examination timetabling problem at Universiti Malaysia Pahang: Comparison of a constructive heuristic with an existing software solution

This paper presents a real-world, capacitated examination timetabling problem from Universiti Malaysia Pahang (UMP), Malaysia. The problem has constraints which have not been modelled before, these being the distance between examination rooms and splitting exams across several rooms. These constrain...

Full description

Saved in:
Bibliographic Details
Main Authors: M. N. M., Kahar, G., Kendall
Format: Article
Language:English
English
Published: Science Direct 2021
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/33571/1/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang_%20FULL.pdf
http://umpir.ump.edu.my/id/eprint/33571/2/The%20examination%20timetabling%20problem%20at%20Universiti%20Malaysia%20Pahang.pdf
http://umpir.ump.edu.my/id/eprint/33571/
https://doi.org/10.1016/j.ejor.2010.04.011
https://doi.org/10.1016/j.ejor.2010.04.011
Tags: Add Tag
No Tags, Be the first to tag this record!