Implication of time equation in mature and immature area of ramp using time driven activity based costing
At present, 28% of world palm oil output and 33% of global exports are accounted by Malaysia. Malaysia has an important role in meeting the rising world demand for oils and fats in the long term as it is a largest producer and exporter of palm oil and palm oil products. In recent times, few problems...
Saved in:
Main Author: | Mohd Yazid, Abu |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UMP
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/29429/1/publication8-RDU1903105.pdf http://umpir.ump.edu.my/id/eprint/29429/ https://journal.ump.edu.my/jmmst/article/view/4884 https://doi.org/10.15282/jmmst.v4i2.4884 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Assessment the capacity utilization of mature and immature area of replanting using time driven activity based costing
by: S. N. A. M., Zaini, et al.
Published: (2020) -
Measuring the Unused Capacity for Mature and Immature Area in Palm Oil Nursery Using Time Driven Activity-Based Costing
by: S. N. A. M., Zaini, et al.
Published: (2021) -
The Impact of Capacity Cost Rate and Time Equation of Time-Driven Activity-Based Costing (TDABC) on Electric Component
by: Nurul Farahin, Zamrud, et al.
Published: (2020) -
Comparative study: Activity based costing and time driven activity based costing in electronic industry
by: Nurul Farahin, Zamrud, et al.
Published: (2020) -
A Review on Time-Driven Activity-Based Costing System in Various Sectors
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2019)