A case study on the determination of unused capacity using time driven activity-based costing for electronic component
Nowadays, demand for magnetic components are increasing from customer to support technological needs. It is important for the producer to incorporate an accurate cost estimation to decide the best price to gain better profits. However, actual costing structure is ignored the potential of time equati...
Saved in:
Main Authors: | , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Penerbit UMP
2020
|
Subjects: | |
Online Access: | http://umpir.ump.edu.my/id/eprint/32392/7/A%20case%20study%20on%20the%20determination%20of%20unused.pdf http://umpir.ump.edu.my/id/eprint/32392/ http://dx.doi.org/10.15282/ijets.7.2.2020.1006 http://dx.doi.org/10.15282/ijets.7.2.2020.1006 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|