Implication of time equation in mature and immature area of ramp using time driven activity based costing

At present, 28% of world palm oil output and 33% of global exports are accounted by Malaysia. Malaysia has an important role in meeting the rising world demand for oils and fats in the long term as it is a largest producer and exporter of palm oil and palm oil products. In recent times, few problems...

Full description

Saved in:
Bibliographic Details
Main Author: Mohd Yazid, Abu
Format: Article
Language:English
Published: Penerbit UMP 2020
Subjects:
Online Access:http://umpir.ump.edu.my/id/eprint/29429/1/publication8-RDU1903105.pdf
http://umpir.ump.edu.my/id/eprint/29429/
https://journal.ump.edu.my/jmmst/article/view/4884
https://doi.org/10.15282/jmmst.v4i2.4884
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.ump.umpir.29429
record_format eprints
spelling my.ump.umpir.294292021-10-29T02:06:18Z http://umpir.ump.edu.my/id/eprint/29429/ Implication of time equation in mature and immature area of ramp using time driven activity based costing Mohd Yazid, Abu S Agriculture (General) At present, 28% of world palm oil output and 33% of global exports are accounted by Malaysia. Malaysia has an important role in meeting the rising world demand for oils and fats in the long term as it is a largest producer and exporter of palm oil and palm oil products. In recent times, few problems have actually happened in this plantation which are difficult to establish a time equation for analyzing the variation of activities, the rate establishment is unsuitable to display the connection between resources supplied and the practical capacity and the manager does not have a method for monitoring capacity usage and unused capacity. The aim of this work is to develop the time equation of mature and immature area at ramp for a better accuracy. Time driven activity-based costing (TDABC) is implemented because the time is successfully measured, the idle capacity is correctly determined and the capacity used and the unused capacity are differently listed. This work considers a data in 2017 to develop the solution. This work found that in the mature area from the available capacity utilization, ramp has high unused capacity with 67492.80 min which means the resources should be forecast properly in future. Meanwhile in the immature area, ramp has closest value to the practical capacity with 6667.20 min and RM5667.12 which indicates the company properly utilizes their resources. Therefore, TDABC provides more comprehensive understanding of practical resources and its associated costs while measuring processes and encouraging quality improvement. Penerbit UMP 2020-09-30 Article PeerReviewed pdf en http://umpir.ump.edu.my/id/eprint/29429/1/publication8-RDU1903105.pdf Mohd Yazid, Abu (2020) Implication of time equation in mature and immature area of ramp using time driven activity based costing. Journal of Modern Manufacturing Systems and Technology (JMMST), 4 (2). pp. 36-39. ISSN 2636-9575 https://journal.ump.edu.my/jmmst/article/view/4884 https://doi.org/10.15282/jmmst.v4i2.4884
institution Universiti Malaysia Pahang
building UMP Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Malaysia Pahang
content_source UMP Institutional Repository
url_provider http://umpir.ump.edu.my/
language English
topic S Agriculture (General)
spellingShingle S Agriculture (General)
Mohd Yazid, Abu
Implication of time equation in mature and immature area of ramp using time driven activity based costing
description At present, 28% of world palm oil output and 33% of global exports are accounted by Malaysia. Malaysia has an important role in meeting the rising world demand for oils and fats in the long term as it is a largest producer and exporter of palm oil and palm oil products. In recent times, few problems have actually happened in this plantation which are difficult to establish a time equation for analyzing the variation of activities, the rate establishment is unsuitable to display the connection between resources supplied and the practical capacity and the manager does not have a method for monitoring capacity usage and unused capacity. The aim of this work is to develop the time equation of mature and immature area at ramp for a better accuracy. Time driven activity-based costing (TDABC) is implemented because the time is successfully measured, the idle capacity is correctly determined and the capacity used and the unused capacity are differently listed. This work considers a data in 2017 to develop the solution. This work found that in the mature area from the available capacity utilization, ramp has high unused capacity with 67492.80 min which means the resources should be forecast properly in future. Meanwhile in the immature area, ramp has closest value to the practical capacity with 6667.20 min and RM5667.12 which indicates the company properly utilizes their resources. Therefore, TDABC provides more comprehensive understanding of practical resources and its associated costs while measuring processes and encouraging quality improvement.
format Article
author Mohd Yazid, Abu
author_facet Mohd Yazid, Abu
author_sort Mohd Yazid, Abu
title Implication of time equation in mature and immature area of ramp using time driven activity based costing
title_short Implication of time equation in mature and immature area of ramp using time driven activity based costing
title_full Implication of time equation in mature and immature area of ramp using time driven activity based costing
title_fullStr Implication of time equation in mature and immature area of ramp using time driven activity based costing
title_full_unstemmed Implication of time equation in mature and immature area of ramp using time driven activity based costing
title_sort implication of time equation in mature and immature area of ramp using time driven activity based costing
publisher Penerbit UMP
publishDate 2020
url http://umpir.ump.edu.my/id/eprint/29429/1/publication8-RDU1903105.pdf
http://umpir.ump.edu.my/id/eprint/29429/
https://journal.ump.edu.my/jmmst/article/view/4884
https://doi.org/10.15282/jmmst.v4i2.4884
_version_ 1715189866176708608
score 13.160551