A case study on pre-commissioning of power transformer / Mohd Harith Ahmad

After new power transformer has been set up on site and before it connect with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transforme...

Full description

Saved in:
Bibliographic Details
Main Author: Ahmad, Mohd Harith
Format: Thesis
Language:English
Published: 2013
Online Access:https://ir.uitm.edu.my/id/eprint/84482/1/84482.pdf
https://ir.uitm.edu.my/id/eprint/84482/
Tags: Add Tag
No Tags, Be the first to tag this record!

Similar Items