A case study on pre-commissioning of power transformer / Mohd Harith Ahmad

After new power transformer has been set up on site and before it connect with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transforme...

Full description

Saved in:
Bibliographic Details
Main Author: Ahmad, Mohd Harith
Format: Thesis
Language:English
Published: 2013
Online Access:https://ir.uitm.edu.my/id/eprint/84482/1/84482.pdf
https://ir.uitm.edu.my/id/eprint/84482/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.84482
record_format eprints
spelling my.uitm.ir.844822024-02-23T03:27:47Z https://ir.uitm.edu.my/id/eprint/84482/ A case study on pre-commissioning of power transformer / Mohd Harith Ahmad Ahmad, Mohd Harith After new power transformer has been set up on site and before it connect with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transformer is to satisfy, to pre determined standards, that all the equipment erection is correct and that all the equipment connections or cables have been installed in accordance with the approved erection drawings and diagrams. This paper describes about some testing before commissioning of power transformer at site (Penang Port Sdn.Bhd., Pulau Pinang). 2013 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/84482/1/84482.pdf A case study on pre-commissioning of power transformer / Mohd Harith Ahmad. (2013) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
description After new power transformer has been set up on site and before it connect with power supply and loading the load, it is must to have to go through numbers of testing procedures for confirming the specifications and performances of a power transformer. The purpose of commissioning tests on transformer is to satisfy, to pre determined standards, that all the equipment erection is correct and that all the equipment connections or cables have been installed in accordance with the approved erection drawings and diagrams. This paper describes about some testing before commissioning of power transformer at site (Penang Port Sdn.Bhd., Pulau Pinang).
format Thesis
author Ahmad, Mohd Harith
spellingShingle Ahmad, Mohd Harith
A case study on pre-commissioning of power transformer / Mohd Harith Ahmad
author_facet Ahmad, Mohd Harith
author_sort Ahmad, Mohd Harith
title A case study on pre-commissioning of power transformer / Mohd Harith Ahmad
title_short A case study on pre-commissioning of power transformer / Mohd Harith Ahmad
title_full A case study on pre-commissioning of power transformer / Mohd Harith Ahmad
title_fullStr A case study on pre-commissioning of power transformer / Mohd Harith Ahmad
title_full_unstemmed A case study on pre-commissioning of power transformer / Mohd Harith Ahmad
title_sort case study on pre-commissioning of power transformer / mohd harith ahmad
publishDate 2013
url https://ir.uitm.edu.my/id/eprint/84482/1/84482.pdf
https://ir.uitm.edu.my/id/eprint/84482/
_version_ 1792159378507300864
score 13.214268