Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff
Public Private Partnership is one of the popular contracts used in building infrastructure in Malaysia. One of the important aspects in the contract is to find reasonable concession period which protect both government and private sectors from losing. This research provides a methodology to narrow t...
Saved in:
Main Author: | Mohamed Yusoff, Nur Hazwanie |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2016
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/73252/1/73252.pdf https://ir.uitm.edu.my/id/eprint/73252/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
An evaluation of highway crash-prone areas: A case study on Pan Borneo Highway in the state of Sarawak
by: Siong Lim, Tan, et al.
Published: (2021) -
Highway surfaces can't cope: Don
by: New Straits Times, Malaysia
Published: (1988) -
Pavement technology elements in green highway
by: Wan Azahar, Wan Nur Aifa, et al.
Published: (2015) -
Design phase constructability concepts in highway projects
by: Hassan, Siti Hafizan
Published: (2005) -
A rational approach for the design of highway formations
by: Kameswara Rao, N.S.V., et al.
Published: (2008)