Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff

Public Private Partnership is one of the popular contracts used in building infrastructure in Malaysia. One of the important aspects in the contract is to find reasonable concession period which protect both government and private sectors from losing. This research provides a methodology to narrow t...

Full description

Saved in:
Bibliographic Details
Main Author: Mohamed Yusoff, Nur Hazwanie
Format: Thesis
Language:English
Published: 2016
Subjects:
Online Access:https://ir.uitm.edu.my/id/eprint/73252/1/73252.pdf
https://ir.uitm.edu.my/id/eprint/73252/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.73252
record_format eprints
spelling my.uitm.ir.732522023-03-20T04:42:05Z https://ir.uitm.edu.my/id/eprint/73252/ Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff Mohamed Yusoff, Nur Hazwanie Industrial policy. The state and industrial organization TE Highway engineering. Roads and pavements Public Private Partnership is one of the popular contracts used in building infrastructure in Malaysia. One of the important aspects in the contract is to find reasonable concession period which protect both government and private sectors from losing. This research provides a methodology to narrow the range of concession period that would benefit both government and private sectors taking the impact of risks into consideration. Required data for this research were obtained by interviewing representatives of private sector and retrieving annual report of the company that was available on Bursa Malaysia. The financial model was evaluated using Monte Carlo simulation on the computational software to compute Net Cash Flow and Net Present Value. The range of concession period for the private sectors and government to negotiate is generated by the simulation. In order to narrow the range of concession period, Bargaining Game Theory was employed. The benefit formulae proposed by L. Y. Shen, Bao, Wu, and Lu (2007) was modified by taking the average between two NPVs to suit the Malaysia case study. Therefore, the modified formulae provides fair benefit for both parties. To demonstrate the applicability of suggested methodology, Build Operate Transfer (BOT) highway project in Malaysia were used in this research. The narrowing concession period was found to be shorter than the actual concession period. Using the suggested methodology, government could further improve its policies in processing BOT projects thus, attract private sectors interest in infrastructure development. 2016 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/73252/1/73252.pdf Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff. (2016) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
topic Industrial policy. The state and industrial organization
TE Highway engineering. Roads and pavements
spellingShingle Industrial policy. The state and industrial organization
TE Highway engineering. Roads and pavements
Mohamed Yusoff, Nur Hazwanie
Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff
description Public Private Partnership is one of the popular contracts used in building infrastructure in Malaysia. One of the important aspects in the contract is to find reasonable concession period which protect both government and private sectors from losing. This research provides a methodology to narrow the range of concession period that would benefit both government and private sectors taking the impact of risks into consideration. Required data for this research were obtained by interviewing representatives of private sector and retrieving annual report of the company that was available on Bursa Malaysia. The financial model was evaluated using Monte Carlo simulation on the computational software to compute Net Cash Flow and Net Present Value. The range of concession period for the private sectors and government to negotiate is generated by the simulation. In order to narrow the range of concession period, Bargaining Game Theory was employed. The benefit formulae proposed by L. Y. Shen, Bao, Wu, and Lu (2007) was modified by taking the average between two NPVs to suit the Malaysia case study. Therefore, the modified formulae provides fair benefit for both parties. To demonstrate the applicability of suggested methodology, Build Operate Transfer (BOT) highway project in Malaysia were used in this research. The narrowing concession period was found to be shorter than the actual concession period. Using the suggested methodology, government could further improve its policies in processing BOT projects thus, attract private sectors interest in infrastructure development.
format Thesis
author Mohamed Yusoff, Nur Hazwanie
author_facet Mohamed Yusoff, Nur Hazwanie
author_sort Mohamed Yusoff, Nur Hazwanie
title Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff
title_short Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff
title_full Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff
title_fullStr Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff
title_full_unstemmed Narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / Nur Hazwanie Mohamed Yusoff
title_sort narrowing range of concession period for build operate transfer highway project under public private partnership using bargaining game theory / nur hazwanie mohamed yusoff
publishDate 2016
url https://ir.uitm.edu.my/id/eprint/73252/1/73252.pdf
https://ir.uitm.edu.my/id/eprint/73252/
_version_ 1761622329366937600
score 13.160551