Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee

The purpose of this dissertation is to study the maintenance planning and procedure for roof stadium in Malaysia. This dissertation is meant to identify the types of maintenance planning and procedure that currently used for roof of stadium. Besides, it is subjected to identify the common defects pr...

Full description

Saved in:
Bibliographic Details
Main Author: Zulkeflee, Mohamad Fakhrul Razi
Format: Thesis
Language:English
Published: 2014
Online Access:https://ir.uitm.edu.my/id/eprint/71197/1/71197.PDF
https://ir.uitm.edu.my/id/eprint/71197/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my.uitm.ir.71197
record_format eprints
spelling my.uitm.ir.711972023-11-16T09:27:19Z https://ir.uitm.edu.my/id/eprint/71197/ Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee Zulkeflee, Mohamad Fakhrul Razi The purpose of this dissertation is to study the maintenance planning and procedure for roof stadium in Malaysia. This dissertation is meant to identify the types of maintenance planning and procedure that currently used for roof of stadium. Besides, it is subjected to identify the common defects problem occurred on the stadium roof and to suggest the proper maintenance planning and procedure in order to minimise the defects and the effectiveness of implementation of the roof stadium. The distribution of the questionnaires and semi interview were conducted to the respondents at the three case studies to collect the data and being analyzed to get the primary data as method of the research. The secondary data has been collected and gathered from the journals, articles, documents or handouts and internet sources. Based on the result, the breakdowns maintenance planning was found of the currently types of maintenance plan used and the flashing failure as the main common defect occurred on the roof stadium at the three case studies. Based, also on the result, the preventive maintenance planning had been recommended as the proper and suitable for maintenance type for roof stadium. The selecting of the proper and good maintenance planning and procedure that should be applied for the roof stadium is very important which it is subjected to prevent the building elements from failure and to ensure the building structure in good condition and safe during operation and functioning as designed. 2014 Thesis NonPeerReviewed text en https://ir.uitm.edu.my/id/eprint/71197/1/71197.PDF Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee. (2014) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
institution Universiti Teknologi Mara
building Tun Abdul Razak Library
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Mara
content_source UiTM Institutional Repository
url_provider http://ir.uitm.edu.my/
language English
description The purpose of this dissertation is to study the maintenance planning and procedure for roof stadium in Malaysia. This dissertation is meant to identify the types of maintenance planning and procedure that currently used for roof of stadium. Besides, it is subjected to identify the common defects problem occurred on the stadium roof and to suggest the proper maintenance planning and procedure in order to minimise the defects and the effectiveness of implementation of the roof stadium. The distribution of the questionnaires and semi interview were conducted to the respondents at the three case studies to collect the data and being analyzed to get the primary data as method of the research. The secondary data has been collected and gathered from the journals, articles, documents or handouts and internet sources. Based on the result, the breakdowns maintenance planning was found of the currently types of maintenance plan used and the flashing failure as the main common defect occurred on the roof stadium at the three case studies. Based, also on the result, the preventive maintenance planning had been recommended as the proper and suitable for maintenance type for roof stadium. The selecting of the proper and good maintenance planning and procedure that should be applied for the roof stadium is very important which it is subjected to prevent the building elements from failure and to ensure the building structure in good condition and safe during operation and functioning as designed.
format Thesis
author Zulkeflee, Mohamad Fakhrul Razi
spellingShingle Zulkeflee, Mohamad Fakhrul Razi
Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee
author_facet Zulkeflee, Mohamad Fakhrul Razi
author_sort Zulkeflee, Mohamad Fakhrul Razi
title Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee
title_short Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee
title_full Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee
title_fullStr Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee
title_full_unstemmed Maintenance planning and procedure for roof of stadium in Selangor / Mohamad Fakhrul Razi Zulkeflee
title_sort maintenance planning and procedure for roof of stadium in selangor / mohamad fakhrul razi zulkeflee
publishDate 2014
url https://ir.uitm.edu.my/id/eprint/71197/1/71197.PDF
https://ir.uitm.edu.my/id/eprint/71197/
_version_ 1783882141206052864
score 13.18916