Project maintenance: success factors of project team / Aisyah Ibrahim
This study is to investigate on success factor of project team in managing Enterprise Resource Planning (ERP) maintenance project in ERP maintenance stage. A case study on Integrated Management System (IMS) was carried out at Universiti Malaysia Pahang (UMP), Pekan, Pahang Darul Makmur in last April...
Saved in:
Main Author: | Ibrahim, Aisyah |
---|---|
Format: | Thesis |
Language: | English |
Published: |
2013
|
Subjects: | |
Online Access: | https://ir.uitm.edu.my/id/eprint/63805/1/63805.pdf https://ir.uitm.edu.my/id/eprint/63805/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Best practices in cost estimation for IT project / Zarirah Zamakhsari
by: Zamakhsari, Zarirah
Published: (2011) -
Knowledge sharing practices in Bank Islam Malaysia Berhad (Kota Bharu branch) / Farah Ardhina Ibrahim
by: Ibrahim, Farah Ardhina
Published: (2010) -
Leveraging big data for economic stability: a dashboard for ASEAN's future growth / Ibrahim Norfiza ... [et al.]
by: Ibrahim, Norfiza, et al.
Published: (2024) -
Project management system for Atlas Engineering Consultant (AEC) / Zaid Ariffin
by: Ariffin, Zaid
Published: (2014) -
Regression analysis of knowledge sharing behavior / Norfadzilah Abdul Razak, Ramita Abdul Rahim and Maimunah Md Shah
by: Abdul Razak, Norfadzilah, et al.
Published: (2019)