Optimization Of Cuf Generation During Parallel Operation With Electric Utility System

Optimization of CUF generation during parallel operation electric with utility system was taken as a title for Final Year Project. The objective of this project is to optimize real and reactive power output of CUF generation during parallel operation with electric utility system. During parallel ope...

Full description

Saved in:
Bibliographic Details
Main Author: Amir Firdaus Bin Said, Amir Firdaus
Format: Final Year Project
Published: Universiti Teknologi Petronas 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/1626/
Tags: Add Tag
No Tags, Be the first to tag this record!
id my-utp-utpedia.1626
record_format eprints
spelling my-utp-utpedia.16262017-01-19T15:48:19Z http://utpedia.utp.edu.my/1626/ Optimization Of Cuf Generation During Parallel Operation With Electric Utility System Amir Firdaus Bin Said, Amir Firdaus TK Electrical engineering. Electronics Nuclear engineering Optimization of CUF generation during parallel operation electric with utility system was taken as a title for Final Year Project. The objective of this project is to optimize real and reactive power output of CUF generation during parallel operation with electric utility system. During parallel operation with electric utility system, field excitation and fuel input need to be optimize in order to prevent reactive power outflow to the utility system. These in turn, reduce the generation cost. The collection of technical details and data regarding the power flow at CUF plant was conducted then being modified to fit with the requirement of the simulation program. Universiti Teknologi Petronas 2009 Final Year Project NonPeerReviewed Amir Firdaus Bin Said, Amir Firdaus (2009) Optimization Of Cuf Generation During Parallel Operation With Electric Utility System. Universiti Teknologi Petronas. (Unpublished)
institution Universiti Teknologi Petronas
building UTP Resource Centre
collection Institutional Repository
continent Asia
country Malaysia
content_provider Universiti Teknologi Petronas
content_source UTP Electronic and Digitized Intellectual Asset
url_provider http://utpedia.utp.edu.my/
topic TK Electrical engineering. Electronics Nuclear engineering
spellingShingle TK Electrical engineering. Electronics Nuclear engineering
Amir Firdaus Bin Said, Amir Firdaus
Optimization Of Cuf Generation During Parallel Operation With Electric Utility System
description Optimization of CUF generation during parallel operation electric with utility system was taken as a title for Final Year Project. The objective of this project is to optimize real and reactive power output of CUF generation during parallel operation with electric utility system. During parallel operation with electric utility system, field excitation and fuel input need to be optimize in order to prevent reactive power outflow to the utility system. These in turn, reduce the generation cost. The collection of technical details and data regarding the power flow at CUF plant was conducted then being modified to fit with the requirement of the simulation program.
format Final Year Project
author Amir Firdaus Bin Said, Amir Firdaus
author_facet Amir Firdaus Bin Said, Amir Firdaus
author_sort Amir Firdaus Bin Said, Amir Firdaus
title Optimization Of Cuf Generation During Parallel Operation With Electric Utility System
title_short Optimization Of Cuf Generation During Parallel Operation With Electric Utility System
title_full Optimization Of Cuf Generation During Parallel Operation With Electric Utility System
title_fullStr Optimization Of Cuf Generation During Parallel Operation With Electric Utility System
title_full_unstemmed Optimization Of Cuf Generation During Parallel Operation With Electric Utility System
title_sort optimization of cuf generation during parallel operation with electric utility system
publisher Universiti Teknologi Petronas
publishDate 2009
url http://utpedia.utp.edu.my/1626/
_version_ 1739830801326931968
score 13.154949