Optimization Of Cuf Generation During Parallel Operation With Electric Utility System

Optimization of CUF generation during parallel operation electric with utility system was taken as a title for Final Year Project. The objective of this project is to optimize real and reactive power output of CUF generation during parallel operation with electric utility system. During parallel ope...

Full description

Saved in:
Bibliographic Details
Main Author: Amir Firdaus Bin Said, Amir Firdaus
Format: Final Year Project
Published: Universiti Teknologi Petronas 2009
Subjects:
Online Access:http://utpedia.utp.edu.my/1626/
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Optimization of CUF generation during parallel operation electric with utility system was taken as a title for Final Year Project. The objective of this project is to optimize real and reactive power output of CUF generation during parallel operation with electric utility system. During parallel operation with electric utility system, field excitation and fuel input need to be optimize in order to prevent reactive power outflow to the utility system. These in turn, reduce the generation cost. The collection of technical details and data regarding the power flow at CUF plant was conducted then being modified to fit with the requirement of the simulation program.