Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach

Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania....

詳細記述

保存先:
書誌詳細
主要な著者: T.J., Deepak, Ponniah, Venishri
フォーマット: 論文
出版事項: Emerald Publishing Limited 2017
主題:
オンライン・アクセス:http://eprints.intimal.edu.my/830/
https://doi.org/10.1108/ECAM-09-2015-0145
https://doi.org/10.1108/ECAM-09-2015-0145
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!

類似資料