Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach

Purpose The purpose of this paper is twofold: first, to develop theoretical underpinnings using TCE, and second, to run the analysis using an advanced tool such as structural equation modeling (SEM). Design/methodology/approach This study was conducted in the construction industry in Tanzania....

Full description

Saved in:
Bibliographic Details
Main Authors: T.J., Deepak, Ponniah, Venishri
Format: Article
Published: Emerald Publishing Limited 2017
Subjects:
Online Access:http://eprints.intimal.edu.my/830/
https://doi.org/10.1108/ECAM-09-2015-0145
https://doi.org/10.1108/ECAM-09-2015-0145
Tags: Add Tag
No Tags, Be the first to tag this record!
Be the first to leave a comment!
You must be logged in first